Committee Report Checklist 

 

Please submit the completed checklists with your report. If final draft report does not include all the information/sign offs required, your item will be delayed until the next meeting cycle. 

 

Stage 1

Report checklist – responsibility of report owner 

ITEM 

Yes / No

Date

Councillor engagement / input from Chair prior to briefing

 

 

Relevant Group Head review  

Yes

03/11/26

MAT+ review (to have been circulated at least 5 working days before Stage 2)

Yes

27/10/26

This item is on the Forward Plan for the relevant committee

 

 

Reviewed by

 

Finance comments (circulate to Finance)

AB

23/10/26

Risk comments (circulate to Lee O’Neil)

LO

20/10/26

Legal comments (circulate to Legal team)

LH

23/10/26

HR comments (if applicable)

 

 

For reports with material financial or legal implications the author should engage with the respective teams at the outset and receive input to their reports prior to asking for MO or s151 comments.

 

Do not forward to stage 2 unless all the above have been completed. 

 

Stage 2

Report checklist – responsibility of report owner 

ITEM

Completed by

Date rec’d

Monitoring Officer commentary – at least 5 working days before MAT

L Heron

23/10/26

S151 Officer commentary – at least 5 working days before MAT

T.Collier

16/10/26

Commissioner engagement

Yes

20/10/26

Delete as applicable:

No issues

Comments in S. 7

Confirm final report cleared by MAT 

 

 

 

 

Corporate Policy and Resources Committee

23rd November 2026

 

Title

General Fund Revenue and Capital Outturn for Qtr.2(M6) 2026/27

Purpose of the report

To inform and assure

Report Author

Altin Bozhani, Deputy Chief Finance Officer

Ward(s) Affected

All Wards

Exempt

Appendix D - Yes

Exemption Reason

Appendix D contains exempt information within the meaning of Part 1 of Schedule 12A to the Local Government Act 1972, as amended by the Local Government (Access to Information) Act 1985 and by the Local Government (Access to information) (Variation) Order 2006 Paragraph 3 – Information relating to the financial or business affairs of any particular person (including the authority holding that information) and in all the circumstances of the case, the public interest in maintaining the exemption outweighs the public interest in disclosing the information because, disclosure to the public would prejudice the financial position of the authority in any lease, contract or other type of negotiation with the tenant or developer, who could then know the position of the Council.

Corporate Priority

Resilience

 

Recommendations

 

Committee is asked to acknowledge the:

1.    Quarter 2 (M6) 2026/27 Revenue and Capital forecast

2.    Projected appropriations to and from General Fund reserves (Earmarked and Ringfenced) the projected balance at 31.03.27 as set out in paragraph 4.3, table 4.

Reason for Recommendation

The Committee needs to be informed regularly of the Council's General Fund revenue and capital budget and consider any action required as appropriate.

 


 

1.         Executive summary of the report (expand detail in Key Issues section below)

What is the situation

Why we want to do something

This report sets out the Council’s revenue and capital Quarter 2 (Month 6) full year forecast position for the 2026/27 financial year.

 

The Business-as-Usual (BAU) Revenue Budget is forecast to underspend by £1.1m against a net budget requirement of £4.8m (paragraph 2.4, Table 1). In contrast, the Non-Business-as-Usual (Non-BAU) budget is forecast to overspend by £7.7m against a net budget requirement of £4.3m in 2026/27. The overspend prior to being offset (£11.7m) relates to:

·         an anticipated investment asset sale not being achieved in 2025/26, resulting in a higher Minimum Revenue Provision (MRP) charge of £3.3m.

·         an estimated £6.8m loss of in-year net revenue income from the sale of investment assets and increase in landlord costs of £1.6m

 

The overall forecast £6.6m overspend is almost entirely attributable to the combined impact of unrealised asset disposals, lost investment income and the consequential increase in MRP charges. Excluding these factors, operational services are forecasting a net underspend.

 

Earmarked Reserve balances at 31.03.27 are projected to be £13.9m, £18.7m lower than 2025/26 (Table 4, paragraph 4.3) attributable to net impact of contributions and usage in 2026/27 financial year.

 

The Council’s savings programme is on target to exceed by £0.261m the £5.8m in the budget largely through efficiency measures. Part of the savings (£4.0m) has already been delivered, and the remaining savings are on target to deliver during the year. Please see a summary in section 2.8 and Appendix C for full details.

 

The 2026/27 Capital Programme at month 6 forecast outturn is £9.8m, £1.3m (12.1%) under the approved budget. A summary of the Capital Programme is provided in section 7 and full details in Appendix E, F and G.

Ensuring the financial stability of the Council and that of West Surrey Council. To understand the financial position being handed onto West Surrey Council

 

Help the Committee to understand any impacts on the budget for 2026/27.

 

Enabling councillors to be made aware of emerging issues on a timely basis to facilitate corrective action to be taken if required.

This is what we want to do about it

These are the next steps

•      Identify measures to continue to review and validate savings and the growth of the approved 2026/27 budget and ensure any variances are reflected in medium term financial planning.

•      Focus on opportunities to deliver additional 2026/27 in-year savings in order to lessen the extent to which reserves are required to close the Budget gap at the year end

•      Use the updated projected use of reserves to feed into updated Reserves Strategy projections and revised 2026/27 Budget figures.

 

2.         Key issues

2.1.       This report provides the Committee with the Revenue and Capital Quarter 2 (Month 6) Forecast outturn for 2026/27, based on expenditure incurred up to the end of September 2026.Further, please see Appendix H for a Local Government Finance Glossary.

The detailed service variances are set out in Appendix B, with commercial asset income detailed in Appendix D


 

General Fund Revenue Budget Qtr. 2 (Month 6) Forecast Outturn – Overview

2.2.       The 2026/27 projected outturn is summarised in Table 1 below.

Appendix B gives a more detailed explanation of variances in the table below.

2.3.       The report variances are calculated using the revised budget which has gone through realignments since the 2026-27 Council’s Approved Budget on 26th February 2026.

Table 1: 2026/27 QTR2 (M6) Forecast Position per Service Area

 

The material forecast variances are:

·         BAU Service Budgets, £1.064m net underspend

Underspends - £1.768m

o   Neighbourhood Services is projecting an underspend of £0.377m, primarily due to increased car park income (£0.206m), a business rates appeal refund for Tothill Street multi-storey car park (£0.080m), vacant posts partially offset by agency costs (£0.069m), and lower vehicle maintenance expenditure (£0.032m). These savings are partially offset by other net adverse variances of £0.010m.

o   Commissioning & Transformation is projecting an underspend of £0.192m, mainly attributable to salary savings arising from vacant posts that have not been recruited to.

o   Legal and Elections, is projecting an underspend of £0.155m, mainly attributable to salary savings arising from vacant posts that have not been recruited to.

 

o   Community & Wellbeing is forecasting an underspend of £0.121m, driven mainly by savings from the Temporary Accommodation Efficiencies Project, staffing vacancies, additional grant income, and increased leisure contract income. These are partially offset by pressures from the Rent Assure Scheme, additional temporary accommodation support staffing, reduced grant funding, and ongoing costs relating to Sunbury Leisure Centre and homelessness prevention initiatives.

 

o   Finance and Corporate Resources, is forecasting an underspend of £0.039m primarily attributable to vacant posts partially offset by agency costs.

 

o   External Grants are forecast to be £0.886m above budget, primarily due to the Adjustment Support Grant net of the reduction in Revenue Support Grant (RSG) (£0.760m), together with the Crisis & Resilience Grant (£0.126m). The final Local Government Finance Settlement was received after the Council's 2026/27 budget had been approved.

 

Offset by overspends - £0.704m

o   Assets Management is forecasting an overspend of £0.448m, primarily due to the estimated loss of recharge income following the winding up of KGE (£0.130m) and increased holding costs on development properties. In particular, the delayed sale of Thameside House, which was assumed in the 2026/27 budget to have been completed in 2025/26, has resulted in unbudgeted business rates, security, and other property holding costs.

o   Place, Protection & Prosperity is forecasting an overspend of £0.256m, mainly due to staffing pressures in Planning Development (£0.150m), driven by agency staff costs to meet HMO and other statutory obligations, and Building Control (£0.109m), reflecting additional resourcing required for the Business Safety Levy, Building Safety Regulator action plan and LGR-related demand. Partially offset by a £0.003m underspend in other areas.

 

·         Non BAU Budgets, £7.691m net overspend

Corporate Items, net underspend of £0.173m

o   Interest payable underspent by £2.613m, primarily due to the early redemption of higher-interest PWLB loans using capital receipts generated through the Asset Rationalisation Programme.

o   Loan Interest Earnings underspend by £0.841m,attributable to more favourable market rates and increased lending to other local authorities

o   Offset by £3.259m overspend in Minimum Revenue Provision (MRP): primarily due to an anticipated investment asset disposal not being completed in 2025/26. This has resulted in an additional £5.0m MRP charge compared with the assumption made when the budget was set. The impact was partially mitigated by a £1.741m reduction in MRP following a revalidation of the Capital Financing Requirement (CFR), which identified schemes that should have been financed from revenue in prior years.

o   Contributions to/from Reserves Prior to closing the Budget Gap, net contribution to revenue of £0.021m higher, primarily attributable to use of earmarked reserves to offset planned revenue budget pressures.

Investment & Regeneration, overspend of £7.864m

o   The overspend is primarily attributable to a shortfall in Investment Property rental income (£6.310m) following the sale of several properties, together with increased Premises Costs (£0.689m) and Supplies & Services expenditure (£0.865m) arising from higher landlord costs, terminated occupancy leases and business rates liabilities. Please see table 3 in section 3 for a summary.

2.4.       Appendix A shows Variances by Committee Area.

2.5.       Chart 1 in the following page shows the individual service budget variances that contribute to the overall service budget favourable variance of £0.178m

 

 

 

 

 

 

 

 

 

 

 

 

Chart 1: Biggest General Fund Direct Revenue Direct Service (Under)/Overspends

2.6.       Details of budget variance and quarterly movements are shown in Appendix B.

2.7.       After taking into account the impact of these changes the projected net overspend is £6.6 (see Table1 above), essentially accounted for by the overspend in Investment & Regeneration (£7.864m) and MRP impact from 2025/26 outturn (£3.3m). This will be funded from reserves.

2.8.       The approved budget for 2026/27 included £5.752m in savings. Finance completed a validation of savings achievement in September 2026 with the results shown in Table 2 below.

Table 2: Savings validation

 

2.9.       The table above includes in year savings of £1m which are on target to deliver £0.161m above the reduced budget:

·         Assets Maintenance Budget £0.4m.

·         Temporary Accommodation review £0.8m.

2.10.    The General Fund forecast shown in Table 1 includes the savings achieved, as set out in Table 2. Appendix C provides further details and shows the savings status project by project for each directorate and savings found.

2.11.    The updated earmarked reserves are lower because of use to cover the budget gap. If the asset rationalisation does not achieve the forecast on capital receipts the reserve balance it is not adequate to cover budget risks in future years. Therefore, it requires close monitoring to ensure that it aligns with the Medium-Term Financial Strategy (MTFS) and to protect the level of reserves passed across to West Surrey Council in 2027/28. Limiting the draw down of reserves was the key rationale for building in £5.8m savings in the 2026/27 Budget. This is a key risk which will continue to be monitored carefully.  Section 4 below shows the reserve movement.

2.12.    Looking ahead, the Council will continue to maintain strict financial discipline to:

·         managing the investment property portfolio,

·         to put West Surrey in the strongest financial position possible.

 

3.    Commercial/Investment Assets

Table 3 - Commercial/Investment Assets

 

 

 

 

 

 

3.1.       Table 3 above outlines the income and costs relating to investment properties, with forecast net rental income (after landlord costs) of £34.8m. This is £7.9m below the level assumed in the 2026/27 revenue budget and represents an £8.2m adverse movement compared with the Quarter 1 forecast.

3.2.       The budget variance and adverse movement since Quarter 1 are primarily attributable to lower rental income following the in-year sale of income-generating assets and higher-than-budgeted landlord costs. Detailed breakdowns are provided in Appendix D: Commercial/Investment Assets Analysis.

3.3.       The rental income forecast reflects the loss of income arising from the sale of eight investment assets during the second half of the financial year.

3.4.       The landlord cost pressure is primarily attributable to the impact of asset sales and the fact that the 2026/27 budget assumed the disposal of an asset by the end of 2025/26. As the sale was delayed, landlord costs that were not included within the budget are now being incurred. This pressure is partially offset by rental income from the asset that was similarly not included within the original budget assumptions.

4.    Projected Movement in Reserves

4.1.       Table 4 sets out the earmarked reserve balances at the end of 2025/26 and the projected balances as at 31 March 2027. Capital receipts are not earmarked reserves but are included in the overall reserve balances shown in Table 6 below.

4.2.       As shown in Table 4, £18.7m of earmarked reserves will be used in 2026/27, leaving a net balance of £13.9m as at 31 March 2027.

4.3.       The in-year reserve position is expected to fluctuate in line with service expenditure forecasts, with the most significant impact arising from slippage in asset sales.

Table 4: Actual General Fund reserve balances at 31 March 2026 and  projected balances at 31 March 2027

      

*The in-year reserve use reconciles to Table 1 and the full breakdown is shown by the table below

              Table 5: In Year Reserve Use Breakdown

4.4.       The MRP charge requires the use of £3.3m of in-year reserves, representing 17% of the total requirement. This reflects the net impact of slippage of the Summit Centre capital receipt into 2026/27.

5.    Flexible Use of Capital Receipts and Overall Usable Reserve balance

5.1.       Table 6 below shows the overall reserve balances, including the movement in capital receipts. The closing reserve balance as at 31/03/26 is £38.4m and the forecast at 31/03/2027 is £18.8m. The forecast assumes that all capital receipts generated during 2026/27 will be applied to capital financing and debt reduction.

Table 6 Overall Usable Revenue and Capital Reserve balance as of 31/03/2027

Table 6 builds upon Table 4 by incorporating capital receipts to show the Council's overall usable reserve position.

5.2.       The Capital Projects line in Table 6 above covers use of capital receipts as a means to fund one-off and ongoing project costs which enable the process of transformation and the resulting benefit realisation. In applying this funding, several measures have been applied to ensure that the qualifying funding criteria are met. These include a robust approval process that is applied whenever the use of capital receipts is considered and to ensure that this funding source is only applied to qualifying expenditure. 

5.3.       A full breakdown of capital receipts allocated per project is shown in Appendix F.

6.    Improvement and Recovery Programme (IRP) – Funded by base budget

6.1.       As required by the Secretary of State’s Statutory Direction issued in May 2025, the Council has established an IRP. This plan was intended to provide the organisation with a clear direction for its improvement journey and a single framework for ensuring that all the Directions were addressed.

6.2.       The original plan was approved by Council on 23 October 2025, and the supporting report formed the initial progress report to Commissioners with a commitment to provide a further update six months later.

6.3.       Authority was delegated to the Corporate Policy and Resources Committee (CPRC) to approve any changes to the IRP as part of regular reporting arrangements. A revised version of the Improvement and Recovery Plan (IRP) was agreed by CPRC on 17 February 2026 to reflect the transition from recovery into sustained improvement and the focus on ensuring a successful transition to the new West Surrey Council.

6.4.       Table 7 below shows the planned and actual spend in 2026/27.

6.5.       IRP Budget list shown in Table 7 has been implemented in the finance ledger, Centros, and monitored along the revenue and capital (with Corporate Policy and Resources Committee receiving quarterly reports).

Table 7: IRP Breakdown within implementation Time Frame

 

 

 

7.    Capital Budget QTR.2 (M6) 2026/27 Forecast – Overview

7.1.       The 2026/27 M6 Capital Programme forecasts total capital expenditure of £9.8m for the year (Table 8, following page). This is £1.4m lower than the Quarter 1 (M2) forecast, primarily due to £1.2m of expenditure on various projects being reprofiled into 2027/28, and £0.143m reduction in the programme value following the completion of several projects. Capital expenditure incurred to date is £2.1m, representing 21.45% of the revised forecast programme. The relatively low level of spend reflects the fact that a number of projects commenced later than originally anticipated and are expected to progress during the remainder of the financial year.

7.2.       A summary of this position is shown in the table below and set out in more detail in Appendix E

Table 8 Summary of 2026-27 Capital Budget QTR.2 (M6) Monitoring

7.3.       Detailed capital project spend monitoring and funding source are provided in Appendices E/F/. Appendix G shows the MTFS Capital Budget allocations.

8.    Options appraisal and proposal

8.1.       This report is “to acknowledge” only.  The Month 6 2026/27 General Fund Forecast will inform the 2026/27 planned mitigations to reduce expenditure and improve cashable efficiency savings. Officers will work to identify further offsetting revenue savings to seek to reduce the extent of the draw down of reserves. Any 2026/27 forecast overspend not mitigated by additional savings/income will be offset by funding from reserves.

9.    Governance and risk considerations

9.1.       The revenue budget for 2026/27 has been set against a backdrop of ongoing economic uncertainty, including inflationary pressures, labour and contract cost volatility, and continued demand growth for key statutory services. There remains a risk that adverse economic conditions could place additional pressure on service budgets, either through reduced income, increased demand‑led expenditure or higher than anticipated cost inflation. Should these pressures materialise, the Council may need to draw on reserves to maintain financial balance, potentially resulting in greater reserve usage than currently assumed in the medium‑term projections.

9.2.       There is an increasing risk arising from staff turnover, coupled with growing workload pressures associated with the Improvement Recovery Plan and Local Government Reorganisation. To mitigate this risk and maintain service delivery, interim resources are being recruited to provide additional capacity and resilience.

9.3.       Savings and budget mitigations incorporated into the 2026/27 budget may be subject to delivery risk, particularly where they rely on behavioural change, service transformation or external dependencies. Delays in implementation or under‑delivery would reduce the effectiveness of planned controls and could result in a higher call on reserves than currently anticipated.

9.4.       The Council’s reserves projections assume the delivery of planned capital receipts within the forecast period. There is a risk that receipts may be delayed or under‑achieved due to market conditions, changes in asset values, or slippage in delivery timetables. Any shortfall or deferral in receipts would reduce the cash resources available to support the revenue spend and capital programme. The main use of capital receipts for the next three years will be covering Capital Financing Requirements needs, mainly future years’ Minimum Revenue Provision. As the case was in 2025/26 the slipping of the Summit Centre sale to 2026/27, and general, slippage in the asset disposal plan has a real impact on the following year’s budget, and the Council’s ability to comply with the Statutory Direction to reduce debt.

10. Legal comments

10.1.    Section 28 of the Local Government Act 2003 requires the Council to monitor their income and expenditure against the approved budget throughout the financial year and to take such remedial action as it considers necessary to deal with any projected overspends or variances.

10.2.    This report provides a high-level summary of the Council’s financial performance for the year, setting out the overall revenue and capital position for Q2 2026/27 (month 6) and highlighting key variances from budget.   

10.3.    Consideration of this report enables the members to satisfy themselves that appropriate financial controls and monitoring arrangements are in place and that the Council’s statutory and fiduciary duties have been complied with.

Corporate implications

11. Commissioners’ comments

11.1.     Commissioners are content that the Council is on track to deliver its savings targets for 2026/27 and that the overall budget, other than the MRP overspend, is also on target.

12. S151 Officer comments

12.1.    As the report sets out, it is important the Committee is provided with timely information on delivery to date against both Revenue and Capital Budgets to enable corrective action to be agreed on a timely basis. At Period 6, after allowing for the known £3.3m MRP budget pressure and £7.9m loss of rental income arising from asset disposals, all other variances result in a net underspend of £4.6m, leaving an overall forecast position of net overspend of £6.6m. The majority of this relates to our investment assets. This is a very significant figure. It is important to bear in mind the additional pressure, compared to the original Budget assumptions, that this overspend places on the reserves and the reduction in balances available to pass across to West Surrey. The Capital monitoring is highlighting a risk of significant slippage into 2027/28.

13. Monitoring Officer comments

13.1.    This report forms part of the Council’s ongoing financial monitoring and supports proper administration of its financial affairs as required by section 151 of the Local Government Act 1972.  This also demonstrates improved governance and effective oversight within the context of the Best Value Directions.

14. Procurement comments

14.1.    There are no procurement implications arising directly from this report.

15. Equality and Diversity

15.1.    The report’s proposals do not directly impact equality and diversity issues but in any spending decision the Council undertakes there should be due regard to equality, diversity and inclusion issues. If there are impacts an equality impact assessment should be undertaken and mitigation measures identified and put in place.

16. Sustainability/Climate Change Implications

16.1.    The implications of this report have little to no impact on the Council’s position on sustainability and climate change actions. The Council continues to strive towards its climate change targets.

17. Other considerations/LGR considerations

17.1.    The outturn position on reserves provides the starting point for refreshing the projected reserves anticipated to be passed across to West Surrey in April 2027.

18. Timetable for implementation

 

Contact: Altin Bozhani, Deputy Chief Finance Officer, a.bozhani@spelthorne.gov.uk

 

Please submit any material questions to the Committee Chair and Officer Contact by two days in advance of the meeting.

 

Background papers: (These are unpublished papers upon which you have relied in preparing this report). If none state, there are none.

 

Appendices:

 

Appendix A - Summary of Qtr.2 (M6) General Fund Outturn Forecast Revenue Budget 2026/27- Committee Structure

Appendix B - Qtr.2 (M6) General Fund Revenue 2026/27 Outturn Budget Monitoring- Variance analysis by Service Area

Appendix C - Qtr.2 (M6) General Fund Revenue 2026/27 Outturn Budget Monitoring- Savings validation

Appendix D - Qtr.2 (M6) General Fund Revenue 2026/27 Outturn Budget Monitoring- Investment Assets Analysis

Appendix E - Qtr.2 (M6) General Fund Capital 2026/27 Outturn Budget Monitoring

Appendix F - Qtr.2 (M6) General Fund Capital 2026/27 Outturn Budget Monitoring Detailed funding source per project

Appendix G - Qtr.2 (M6) General Fund Capital 2026/27-2029/30 Budget

Appendix H- Local Government Finance Glossary

 

           

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Appendix A - Summary of Qtr.2 (M6) General Fund Outturn Forecast Revenue Budget 2026/27- Committee

Appendix B - Qtr.2 (M6) General Fund Revenue 2026/27 Outturn Budget Monitoring- Variance analysis by Service Area

 

Assets Service

The key variations within the Assets Service are set out below.

                                                                                                                           

Appendix B - Qtr.2 (M6) General Fund Revenue 2026/27 Outturn Budget Monitoring- Variance analysis by Service Area

 

Commissioning & Transformation Service

The key variations within the Commissioning & Transformation Service are set out below.

Appendix B - Qtr.2 (M6) General Fund Revenue 2026/27 Outturn Budget Monitoring- Variance analysis by Service Area

 

Community & Wellbeing Service

The key variations within the Community & Wellbeing Service are set out below.

 

Appendix B - Qtr.2 (M6) General Fund Revenue 2026/27 Outturn Budget Monitoring- Variance analysis by Service Area

 

Finance & Corporate Services

The key variations within the Finance & Corporate Service are set out below.

 

 

 

 

 

 

 

 

Appendix B - Qtr.2 (M6) General Fund Revenue 2026/27 Outturn Budget Monitoring- Variance analysis by Service Area

 

Legal and Elections

The key variations within the Legal and Elections Service are set out below.

 

 

 

 

 

 

 

 

 

 

 

Appendix B - Qtr.2 (M6) General Fund Revenue 2026/27 Outturn Budget Monitoring- Variance analysis by Service Area

 

Neighbourhood Services

The key variations within the Neighbourhood Services are set out below.

 

 

 

 

 

 

Appendix B - Qtr.2 (M6) General Fund Revenue 2026/27 Outturn Budget Monitoring- Variance analysis by Service Area

 

Place, Protection & Prosperity

The key variations within the Place, Protection & Prosperity Services are set out below.

 

 

 

 

 

 

 

Appendix B - Qtr.2 (M6) General Fund Revenue 2026/27 Outturn Budget Monitoring- Variance analysis by Service Area

 

Place, Protection & Prosperity-Continued

 

 

 

 

 

 

 

 

 

 

Appendix C - Qtr.2 (M6) General Fund Revenue 2026/27 Outturn Budget Monitoring- Savings validation

 

 

 


 

Appendix E - Qtr.2 (M6) General Fund Capital 2026/27 Outturn Budget Monitoring

 

Appendix E - Qtr.2 (M6) General Fund Capital 2026/27 Outturn Budget Monitoring-Continued

 

Appendix E - Qtr.2 (M6) General Fund Capital 2026/27 Outturn Budget Monitoring-Continued

 

Appendix E - Qtr.2 (M6) General Fund Capital 2026/27 Outturn Budget Monitoring-Continued

 

 

Appendix E - Qtr.2 (M6) General Fund Capital 2026/27 Outturn Budget Monitoring-Continued

 

                                   

 

2026/27 Approved Budget

Managers Projected Outturn at Qtr.2 September 2026 (M6)

 

£'000

£'000

Funding

 

 

Grants received from Central Government

 

 

DFG - Grants + Top Up

(1,327)

(1,327)

Local Authority Housing Fund Grant

(425)

(425)

Other Grants

(484)

(484)

Subtotal

(2,236)

(2,236)

Other Financing

 

 

Capital Receipts- year end

(2,684)

(2,684)

CIL

(688)

(688)

Developer contributions

(3,851)

(3,851)

Earmarked Reserves

(348)

(348)

Total Committed  Financing

(9,806)

(9,806)

Slippage to next year

(1,201)

0

Underspends

(143)

0

Grand Total

(11,150)

(9,806)

 

 

 

 

Appendix F - Qtr.2 (M6) General Fund Capital 2026/27 Outturn Budget Monitoring Detailed funding source per project

Appendix G - Qtr.2 (M6) General Fund Capital 2026/27-2029/30 Budget